Maynard rail road station, photo taken 1910. Courtesy of Maynard Historical Society. Click on any photo to enlarge. |
Same site, once auto shop, later dry cleaner's, now empty. Potentially a site for a Maynard visitors' center? |
See articles related to construction in July, August, October and November 2016.
People with long memories can recall the end of Maynard's railroad passenger service in 1958. Less noted was the decline and end of freight service in the 1960s. After decades of disuse the railroad and MBTA each gave up on resurrecting rail service. The 12.4 mile long right of way was deeded over the five communities (Acton, Maynard,Stow , Hudson and Marlborough). Some of the land
was subsequently sold to private owners. And there it lay, a broken-up ghost of
a railroad spur dating back to the 1850s, once traveled by as many as twenty
trains a day, crossties rotting and trees growing up between the rails.
People with long memories can recall the end of Maynard's railroad passenger service in 1958. Less noted was the decline and end of freight service in the 1960s. After decades of disuse the railroad and MBTA each gave up on resurrecting rail service. The 12.4 mile long right of way was deeded over the five communities (Acton, Maynard,
The concept of converting obsolete railroads to pathways for
non-motorized use, i.e., "rails-to-trails," began in Wisconsin in 1967 with
the opening of the 32 mile long Elroy-Sparta State Trail. Important milestones
were the National Trails System Act, which allowed for conversion of
government-granted railroad right-of-ways be converted to trails, and the
Transportation Equity Act (TEA-21, passed in 1998), which permitted federal
funding for transportation improvements other than in support of planes, trains
and automobiles. The law has gone through name changes but the goal of federal support for non-motorized transportation remains.
Rails were removed in 2014 and sold for scrap steel. A few pieces were left behind where trees had grown over the rails. |
According to the Rails-To-Trails Conservancy organization
(railstotrails.org) there are now more than 22,000 miles of official
ex-railroad trails in the United
States . Another 8,000+ miles are in building
or planning phases. Lengths range from the 253 mile John
Wayne Pioneer Trail , Washington ,
to the 1.5 mile Manhattan High Line, New
York . In Massachusetts ,
two of the best-known are the 22 mile Cape Cod
Rail Trail and the 10 mile Minuteman Bikeway.
Trails take two forms, either packed crushed stone or paved.
The first has a much lower construction cost, but higher maintenance. The
second can easily exceed $1,000,000 per mile, especially if bridges are needed.
In all instances the majority of the cost is federally funded. The remainder is
divided between states and towns crossed by the trails.
Locally, the vision of a rail trail on the Acton
to Marlborough
right of way was begun in 1992 by a few interested residents acting in concert
with town employees. A plus for potential funding was the intermodal nature of
the concept - with the north end anchored at the South Acton train station,
users could walk or bicycle to Acton to commute
by train, or the reverse, commute by train to Acton to get to work in neighboring towns. To
this end, the Acton
train station rents enclosed bicycle lockers for $75/year, soon to go to $100/year.
ARRT sign put up by volunteers years ago, to promote awareness and use as a walking trail. |
The Assabet River Rail Trail organization (ARRTinc.org) was
created in 1995 to coordinate volunteer activity. The five towns voted to
approve the trail in 1998. Jeff Richards was the first ARRT president, followed
by Thomas Kelleher, who has served in that position since 2001. Duncan Power
has been clerk for as long. ARRT members have been instrumental in fostering
awareness of the proposed trail. For Acton and Maynard that included literally
hundreds and hundreds of hours clearing and maintaining the right of way for
hikers and bikers. While a few people have been ambivalent about the planned
trail ("It's right behind my house!" or "Why does it have to be
paved?"), most of the comments have been positive.
Trail construction in Maynard and Acton is to start July 2016 and be completed by May 2018 (all but the final landscaping and fencing should be done by late 2017). After this 3.4 miles is completed at the northeast end, to go with the years-old 5.8
miles at the southwest end (in Hudson and Marlborough), what is planned for the middle? Negotiations are underway for Track Road , the two
miles between the Maynard/Stow border and Lake Boon .
Beyond that, the trail would require two (expensive to build) crossings of the Assabet River, and a wide swath of land between the bridge sites is in private
ownership. An alternative would be to detour south across the Assabet River National Wildlife
Refuge before turning west. This would add many (scenic) miles to the
originally proposed length, but obviate the need for bridges and the repurchase of the original right-of-way. Either way, the next phase of the trail is years
and years away before any possible funding.
An oft-asked question is whether the Acton
end of ARRT will link to the Bruce
Freeman Trail, currently being extended south through the east edge of Acton, toward West Concord. There is no rail right-of-way between the two, and thus no good option for an
off streets connection. One possibility would be to create a three mile long
bicycle lane on School Street
and Laws Brook Road .
June 2013 has a long write-up on walkability of all of ARRT. Visit www.ARRTinc.org for maps, etc.
An exhibit on the history of the railroad and transition to a rail trail was put on display in the Maynard town building on June 28, 2016, in anticipation of construction beginning on the Acton and Maynard portion of the trail. The display case on the main floor includes ten photographs, five pages of text showing the timelines of the railroad and the trail, and explanatory captions. One text panel explains how Amory Maynard's teenage son - Harlan - took the train to Concord to attend school at a private school run by Frank Sanborn. Harlan's classmates included Ralph Waldo Emerson's children and one of his teachers was Henry David Thoreau. The lower part of the case contains a section of original rail, baseplate, spikes and cross tie, plus extra spikes painted in Maynard school colors of black and orange. The exhibit was removed in October but it may be installed at the library in November.
June 2013 has a long write-up on walkability of all of ARRT. Visit www.ARRTinc.org for maps, etc.
Display of railroad rail mounted on cross tie |